Welcome to Zuora Product Documentation

Explore our rich library of product information

Migration updates for EU production environment

List of impacted features from sandbox to production transfer in the EU region with special consideration to limit disruption.

S.No

Description

Sandbox

Production

1

Access links for UI/backend

Sandbox endpoints to be updated:

  • https://sandbox.eu.zuora.com/

  • https://rest.sandbox.eu.zuora.com/

Production endpoints to be updated:

  • https://rest.eu.zuora.com (API)

  • https://eu.zuora.com/ (UI)

2

Notifications /Callouts

Notifications are triggered based on UTC timezone (compared to PT in the US tenant)

In the US, tenant notifications follow the PT timezone, whereas UTC is the standard in general

3

Workflows

Data migration excludes workflow run and log data.

Data migration excludes workflow run and log data.

4

Tenants IDs

No impact

No impact

5

IP settings

Use IP addresses from the EU sandbox

Use IP addresses from the EU production

6

Downtime

The downtime is under 3 minutes

The downtime is under 3 minutes

7

Feature freeze window

2-hour feature freeze window

2-hour feature freeze window

8

History/ Audit Trail

The migration process does not include telemetry and login history. (can be accessed from the audit trail via DQ.)

Audit Trail will undergo a full migration.

9

User access

The process continues as usual after migration, with the only difference being the location of the OAuth token in the EU instead of the US. The process has no impact on the end user.

The user access process remains the same after migration, except that OAuth tokens are now generated in the EU. Tokens generated in the US region become invalid, but end users are not affected.

10

Test User Account

Set up a pre-migration test user account to verify migrated data.

Set up a pre-migration test user account to verify migrated data.